Summary
The line runs from Poonamallee to Vadapalani, covering about 15 kilometres with eleven stations.
It includes a 3.7 kilometre double‑deck section, allowing two levels of tracks.
Advanced signalling technology enables driverless train operation.
Regular service began at 4 pm on Sunday and will operate from 7 am to 9 pm starting 12 October.
The project cost around 4,900 crore Indian rupees.