← Back
Article image
πŸ“° News ⏱ 2 min
πŸ”‘

Key Points

6 points
1

Prime Minister Narendra Modi inaugurated the new Chennai Metro stretch.

2

The stretch connects Poonamallee and Vadapalani, covering roughly 15 km.

3

Eleven elevated stations were built along the route.

4

A 3.7 km double‑deck section allows two trains to travel side by side.

5

Advanced signalling enables driverless operation of the trains.

6

Regular passenger service began at 4 pm on Sunday, with extended hours from October 12.

πŸ“–

Summary

The new line runs from Poonamallee to Vadapalani and includes eleven stations.

A special 3.7‑kilometre section has two levels of tracks, called a double‑deck.

Modern signalling lets the trains run without a driver.

The service started on Sunday at 4 pm and will later run from 7 am to 9 pm each day.

The project cost about 4,900 crore Indian rupees, a very large amount of money.

πŸ“˜

New Words to Learn

13 words
inaugurated
officially opened
stretch
a long part of a road or track
elevated
built high above the ground
double‑deck
two levels stacked one on top of another
signalling
systems that tell trains when to go
driverless
operated without a person driving
commuters
people who travel to work or school
connectivity
how easy it is to travel between places
suburbs
areas outside the main city
crore
ten million (a very big number)
phase
a stage in a big project
cost
how much money was needed
Indian rupees
the money used in India
πŸ”— Read Full Article β†’

Want to learn even more? Click here to read the full story!

πŸ”Š Reading Article
Kid-friendly voice
πŸ†

New Badge Unlocked!

Badge Name
Badge description